Fresenius Medical Care 2008K Troubleshooting Manual page 215

Hemodialysis system
Hide thumbs Also See for 2008K:
Table of Contents

Advertisement

DAIR- 3.0.0 CHECK ACTUATOR BOARD CONTROL
a) IMPORTANT! Remove the clamp(s) from the vent tubing and assure the water is on.
b) Enter Service Mode
c) Select the [Pump Rate] data box. The data box turns bright yellow.
d) Set the [Pump Rate] data box to "0".
e) IMPORTANT! Press the 'CONFIRM' key. The [Pump Rate] data box turns pale yellow.
f)
Referring to
Figure 82
Yes
Replace the actuator board (see
No
DAIR- 3.0.1
DAIR- 3.0.1 ATTEMPT CALIBRATION
a) Referring to
Appendix A
procedure. IMPORTANT! Press the 'CONFIRM' key after each adjustment of the [Pump Rate]* data
box. *NOTE: [Pump Rate] values should be no less than 180 or no greater than 215!
b) Are you able to achieve target deaeration pressure without exceeding 215?
Yes
Problem solved!
No
Do NOT press the 'CONFIRM' key (i.e. do NOT save the calibration)! See procedure number
DAIR- 4.0.0
DAIR- 4.0.0 ISOLATE VALVE #39
This procedure checks if valve #39 is 'stuck' open causing low deaeration pressure:
a) Referring to
Figure 84
chamber. TIGHTLY double clamp its clear tubing at the location specified in
b) Attempt Deaeration and Loading Pressure calibration. IMPORTANT! Press the 'CONFIRM' key after
each adjustment of the *[Pump Rate] data box. Are you able to achieve target deaeration pressure
without exceeding 215?
Yes
Do NOT press the 'CONFIRM' key (i.e. do NOT save the calibration)! See procedure
number
No
See procedure number
DAIR- 4.0.1 ISOLATE VALVE #39 / ACTUATOR BOARD
Remove valve #39's clamps. Does deaeration pressure remain at target?
Yes
Press the 'CONFIRM' key to save the calibration. Problem solved
No
Do NOT press the 'CONFIRM' key. See procedure number
DAIR- 4.0.2 ISOLATE ACTUATOR BOARD / VALVE #39
a) Referring to the Figure (right), unplug valve 39 from
distribution board position V39, "DEAR-V" (2
from the right).
b) Does deaeration pressure remain at target?
Yes
Replace the actuator board.
No
Replace valve #39 (leaking).
Calibrate Hydraulics
(page 211), is the deaeration motor shaft rotating?
Figure
(page 213).
(page 260), attempt Deaeration and Loading Pressure calibration per
(page 213).
(page 212), valve #39 is mounted at the bottom of the Hydro block or Hydro
DAIR- 4.0.1
(page 213).
DAIR- 5.0.0
Fresenius 2008K Troubleshooting Guide
P/N 507298 Rev. B (Draft 1)
Deaeration.
4A, page 8).
(page 214).
DAIR- 4.0.2
nd
connector
Section 13 – Deaeration Problems
Figure
84.
(page 213).
Page 213

Advertisement

Table of Contents
loading

Table of Contents