Installation Verification - Huawei SmartLi 1.0 User Manual

Hide thumbs Also See for SmartLi 1.0:
Table of Contents

Advertisement

SmartLi 1.0
User Manual

3.4 Installation Verification

Table 3-2 Installation checklist
No.
01
02
03
04
05
06
07
09
10
11
Issue 08 (2022-11-15)
Item
SmartLi
installation
Neat
arrangement
Cable layout
Cable labels
Cable ties
Cable
connections
Grounding
Battery cable
connections
Checking the
pressure gauge
Foreign matter
cleaning inside
the cabinet
Copyright © Huawei Digital Power Technologies Co., Ltd.
Acceptance Criteria
The SmartLi is securely installed and does not tilt
due to vibration.
The SmartLi and its adjacent cabinets are neatly
arranged and secured with connecting plates.
Cables are routed properly and cable routing meets
customer requirements.
Both ends of a cable are labeled. Labels are concise
and easy to understand.
Cable ties are secured evenly and no burr exists.
The output, and battery cables are securely
connected. For the cables secured by screws, the
spring washers are flattened.
The resistance between the SmartLi ground bar and
the equipment room ground bar is less than 0.1
ohm.
The SmartLi is correctly connected to the UPS.
Check whether the pressure gauge pointer is in the
green zone and whether the pressure value is
greater than 1.6 MPa at 20°C.
The inside and outside of the cabinet, and other
operating components, are free from conductive
dust.
1. There is no foreign matter (such as copper wires
and screws) on the top of the cabinet.
2. There is no foreign matter on the copper bar
terminals.
3. There is no foreign matter around switch
terminals.
4. There is no foreign matter on the bottom plate of
the cabinet.
5. There is no foreign matter on the rear module
subrack.
3 Installation
56

Advertisement

Table of Contents
loading

Table of Contents