SmartLi 1.0
User Manual
Procedure
Step 1 Remove the cover from the PDU.
Figure 3-16 Removing the cover from the PDU
Step 2 Remove the top cover from the cabinet based on cable routes and dimensions.
Figure 3-17 Removing the top cover
Step 3 Install a PE cable.
Issue 08 (2022-11-15)
NO TE
2
The 70 mm
ground cable is recommended.
Copyright © Huawei Digital Power Technologies Co., Ltd.
3 Installation
43