SmartLi 1.0
User Manual
5.4 Clearing the EPO State
Procedure
Step 1 Clear the EPO state. Ensure that the EPO button connected to the external EPO is
not in the EPO state.
Step 2 On the LCD screen, choose Alarms > Clear Faults. In the displayed dialog box, tap
Yes. The Battery cabinet shutdown alarm is cleared successfully.
Figure 5-2 Clearing faults
Step 3 View active alarms and ensure that the Battery cabinet shutdown alarm has
disappeared from the alarm list.
----End
5.5 Adding a SmartLi
Prerequisites
For online capacity expansion, you need to configure an external circuit breaker to
control the battery loop.
Context
This section describes how to add a SmartLi to four cabinets in parallel.
Issue 08 (2022-11-15)
Copyright © Huawei Digital Power Technologies Co., Ltd.
5 Operations
79