Hauling The Tractor And Implement - Schulte GLADIATOR RWP-1935 Operator's Manual

Variable width rock windrower/picker
Table of Contents

Advertisement

14.2 Hauling the Tractor and Implement

Before
transporting
implement, measure the height and width
dimensions and gross weight of the complete
loaded unit. Ensure that the load will be in
compliance with the legal limits set for the areas
that will be traveled through. OPS-U- 0024str
Use adequately sized and rated trailers and
equipment to transport the tractor and implement.
Consult an authorized dealer to determine the
proper equipment required.
sized chains, heavy duty straps, cables and/or
binders, securely tie down both the front and rear
of the tractor utilizing the proper tie down locations
as specified by the tractor manufacturer. OPS-U-
0025 str
Arrange the chains so that when tightened, the
chains
are
pulling
themselves. Carefully tighten the securing chains
or other fasteners using boomers or binders to
apply maximum tension. Use extreme care when
attaching and removing the securing devices as
the extreme tension involved when released has
the potential to inflict serious injury.
While hauling the tractor and implement, make
occasional stops to check that the tractor and
implement have not moved or shifted and that the
securing chains have maintained tension. If during
transport a hard braking, sharp turning, or swerving
action was performed, stop at the next safe
location to inspect the security of the load. OPS-U-
0026str
Gladiator RWP-1935 01/23
© 2023 Alamo Group Inc.
OPERATION
a
loaded
tractor
and
Using adequately
downward
and
against
Operation Section 4-41

Advertisement

Table of Contents
loading

Table of Contents