Thermo Scientific Orion 8030cX Instruction Manual page 15

Silica analyzer
Table of Contents

Advertisement

Item
Name
No.
1
Flow cell body
Flow cell upper
2
cover
3
Pan head
screw
4
Large Straight
joint
Large Overflow
5
tubing to drain
6
Small Straight
joint
Small Sample
7
inlet tubing
8
Middle Straight
joint
Middle Sample
9
inlet tubing
10
Cable tie
11
PTFE tape
Figure 3.4: Flow Cell Components
Note: PTFE tape shall be wrapped around the thread for
sealing and preventing water sample leaking, at least 4
rounds recommended.
8030cX Silica Analyzer
Specification
Quantity
1
1
2
M4x40, stainless
steel
G1/2 external thread
1
to ID 12 mm OD 16
mm plastic tubing
Plastic ID 12 mm OD
1
16 mm, length 1m
G1/2 external thread
1
to ID 4 mm OD 6 mm
plastic tubing
Plastic ID 4 mm OD
1
6 mm, length 0.2 m
G1/2 external thread
1
to ID 6 mm OD 8 mm
plastic tubing
Plastic ID 6 mm OD
1
8 mm, length 0.2 m
2
Several
The entire flow cell is mounted on the outside cabinet wall
of the 8030cX Silica Analyzer with two M4 x 40 mm
screws, as shown in Figure 3.4.
Figure 3.5: Flow Cell Installation Position
Note:
The inlet port in Flow cell is connected to the
common port in the sequencer (if used) and the
pressure or flow speed is often adjusted by a valve
to meet the requirements (seen in the table 2.1).
Description of flow cell installation steps:
1. Check the outer diameter of sampling tube (6mm
or 8mm OD), and choose the right-size straight
joint, then connect it to the flow cell (if the sampling
tube's OD (Outer Diameter) is 6mm, choose the
small straight joint, otherwise use the middle
straight joint), PTFE tape is recommended to wrap
around the thread before connecting.
Installation
Chapter 3 | 13

Advertisement

Table of Contents
loading

Table of Contents