5.2. Installation
5.2.1. Inogun A FCC FCC version
• Place the index pin on the holding flange.
• Pass the LV cable through the support tube.
• Manually connect the LV cable and the air and powder
hoses to the projector.
• Align the tube with the index pin.
then tighten the nut.
Air
26
DRT7133
D - 2023/01
Powder
Member of Exel group