Smartgen HES7120-PV User Manual page 12

Hybrid energy controller
Table of Contents

Advertisement

factor.
PV two screens: phase voltage, line voltage, frequency, phase sequence, voltage
imbalance percentage, current, active power, reactive power, apparent power, power
factor, maximum capacity.
Solar panel one screen: voltage, current, power of the maximum four channels.
Sensor data three screens: programmable analog 1, programmable analog 2,
programmable analog 3, programmable analog 4, programmable analog 5, battery
voltage, controller time.
Total accumulative data one screen: accumulative running time, accumulative starting
times, accumulative active power, reactive power, apparent electric energy.
The accumulative data one screen: the running time, the electric energy, the average
power and the historical power.
User A accumulative data one screen: accumulative running time, accumulative startup
times, accumulative active power.
User B accumulative data one screen: accumulative running time, accumulative startup
times, accumulative active power.
Output active and reactive power percentage one screen: the current active power
percentage of the busbar, the current reactive power percentage of the busbar, the
current active power percentage of PV, the target reactive power percentage of PV, the
target reactive power percentage of PV, the current power factor of PV, and the target
power factor of PV.
c)
Status interface includes the following contents:
Status one screen: system mode, automatic start/stop delay, busbar status, system PV working status,
circuit breaker switching status.
d)
Alarm interface includes the following contents:
The specific alarm contents of stop alarm, trip alarm, trip without stop alarm and warning alarm.
NOTE: Illustration for power factor display
P is the active power
Q is reactive power
HES7120-PV Hybrid Engergy Controller
HES7120-PV HYBRID ENERGY CONTROLLER USER MANUAL
2020-05-20
Version
Page 12 of 59

Advertisement

Table of Contents
loading

Table of Contents