Smartgen HES7120-PV User Manual page 36

Hybrid energy controller
Table of Contents

Advertisement

Items
No.
15
Loading Slope
Loading Slope Delay
16
Point
17
Loading Slope Delay
18
Unloading Slope
Percentage of Active
19
Power
Regulation
Limit
Reactive
20
Regulation
Percentage
21
PV Unloading Open
Solar
22
Temperature 1 Input
Selection
Solar
23
Temperature 2 Input
Selection
Solar
24
Temperature 3 Input
Selection
Light
Irradiance
25
Input Selection
Light
Irradiance
26
Input Selection
Light
Irradiance
27
Input Selection
Solar
28
Temperature 1 Power
Curve
HES7120-PV Hybrid Engergy Controller
HES7120-PV HYBRID ENERGY CONTROLLER USER MANUAL
Range
(0.0-100.0)
% /s
(0.1-50.0)%
(0-30)s
(0.0-100.0)
% /s
(0-100.0)%
Power
Limit
(0-100.0)%
(0-1)
(0-100.0)%
(0-3600)s
Panel
(0-6)
Panel
(0-6)
Panel
(0-6)
1
(0-6)
2
(0-6)
3
(0-6)
Panel
Default
3.0
When the loading slope delay point is
reached, the loading slope delay time
is suspended, and the target power
10.0
percentage increases.
0
Decrease the target power slope by
3.0
the
percentage
unloaded.
Limit active / reactive power regulation.
10.0
If the difference between the current
power percentage and the target
power percentage is greater than this
10.0
setting value, the maximum output is
limited according to this setting.
PV unloading opening enable, 0: not
enabled; 1: enabled.
If this function is enabled, it will be
1
opened when unloading fails;
On the contrary, it will not open when
unloading fails.
Active power percentage of unloading
10.0
opening
Unloading failure alarm delay value.
60
PV unload failure alarm is always valid.
0
0
0: not enabled
1: Sensor 1
2: Sensor 2
0
3: Sensor 3
4: Sensor 4
5: Sensor 5
0
6: Communication
0
0
Curve setting
X - corresponding temperature or
irradiance
2020-05-20
Version
Description
of
power
to
Page 36 of 59
be

Advertisement

Table of Contents
loading

Table of Contents