INSTALLATION
Battery Rack
810.90017-00
810.90016-00
1 cluster: 1 X 4500
1 cluster: 1 X 4500 mm,
mm, 35mm2 Power
35mm2 Power Cable,
Cable,
Red-Red, For HV Box –
Black-Black, For HV
Junction box
Box - Junction box
LONGMAX
Enjoy the sunny life
PV Combiner Box
WARNING
Do not open the door,only
Do not open the door,only
for authorised personal.
for authorised personal.
PV Combiner box (If
1 x Meter with 3 CT
applicable)
(on-grid mode-DC);
2 x Meter with 6 CT
(on-grid mode
-AC/Hybrid)
1 X Operation and
maintenance manual
System
3*CT (on-grid
1 X Installation manual
mode-DC);
6*CT (on-grid mode
-AC/Hybrid) Outline
size(W*H*D)
:90*14*40mm
Through size(a*e)
:20*30mm
22
23
4.3 Installation

4.3.1. PCS Installation

4.3.1.1 Removal
When removing the T50/T100-INV, a forklift can be used to remove the whole case.
Users can lift the device bottom with a forklift or remove the inverter cabinet through the
lifting hole on its top with a crane. It can be transported alone.
4.3.1.2 Operation Space
During the installation of the PCS, a proper distance from its peripheral walls to the door
should be kept as to ensure that the machine door can be opened and closed
conveniently and there will be sufficient space for module insertion and extraction,
normal heat dissipation and user' soperation.
Figure 4-1 Moving method for inverter
A
B
Figure 4-2 Installation space
INSTALLATION

Advertisement

Table of Contents
loading

This manual is also suitable for:

Storion-t100

Table of Contents