A.Connect DO_2 (port 1 & 2) to the dry contact of the generator, because port 2 and 3
are normally closed but 1 and 2 are normally open.
B.Please connect the generator controller to dry contact as the Figure 4-28 shows.
TOP BMU box
-Dry contact
Figure 4-28 Connecting the communication cable for generator
4.4.9. Sealing Measures
NOTE : When the wiring is completed, use fireproof mud or other non-inflammable and
well-sealed materials to block the inlet.
40
Controller
Generator
41
05
Start-up and Operation
Please refer to the Operation Manual for details.
OPERATION & MAINTENANCE MANUAL
INSTALLATIONMANUAL
OF ENERGY STORAGE SYSTEM (ESS)
ENERGYSTORAGESYSTEM(ESS)
STORION-SMILE-T10(INDOOR)
STORION-T50/T100 (INDOOR, WITH M48112-S)
START-UP AND OPERATION
V01

Advertisement

Table of Contents
loading

This manual is also suitable for:

Storion-t100

Table of Contents