Sartorius Cubis Series Operating Instructions Manual page 71

Electronic precision and analytical balances
Hide thumbs Also See for Cubis Series:
Table of Contents

Advertisement

2
1
Place the panels in the packaging.
t
1. Place the upper draft shield panel into the packaging (handle upwards).
2. Place the side panel into the packaging (handle upwards)
3. Place the other side panel into the packaging (handle downwards).
3
Insert the front foam pieces into the box, wedging the panels into the back
t
foam pieces.
Place the cardboard insert into the box.
t
Place the pan support into the opening.
t
Place the weighing pan on the pan support.
t
Transport
Operating Instructions Cubis MSE
71

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents