Power Steering Gear Box And Linkage - Mitsubishi Pajero Pinin 1999 Workshop Manual

Table of Contents

Advertisement

STEERING ±

POWER STEERING GEAR BOX AND LINKAGE

REMOVAL AND INSTALLATION
Caution: SRS
On vehicles with SRS, before removing steering gear box, refer to GROUP 52B. Also, put the front
wheels in straight±ahead position and remove the ignition key. Failure to do so may damage the
SRS clock spring and render the SRS air bag inoperative, which results serious driver injury.
Pre-removal Operation
Power Steering Fluid Draining (Refer to P.37A-9.)
Under Cover Removal
<L.H. drive vehicles>
15 ± 33 Nm
2
Power Steering Gear Box and Linkage
3
5
9
4
34 Nm
11
70 Nm
Post-installation Operation
Check the Dust Cover for Cracks or Damage by
Pushing it with Finger.
Under Cover Installation
Power Steering Fluid Supplying and bleeding
(Refer to P.37A-9.)
Checking Steering Wheel Position with Wheels
Straight Ahead
Front Wheel Alignment Check and Adjustment
(Refer to GROUP 33A ± On-vehicle Service.)
15 Nm
6
12 Nm
10
8
12
2
37A-15
18 Nm
1
13

Advertisement

Table of Contents
loading

Table of Contents