Checklist For The Installation Of The Webasto Charging Station - Webasto Unite Operating And Installation Instructions

Table of Contents

Advertisement

16 | Checklist for the installation of the Webasto charging station

Mechanical specifications
Weight with package
AC Mains Cable Dimensions
Cable Inlets
Environmental technical specifications
Protection class
Impact protection
Usage conditions
16
Checklist for the installation of the Webasto charging station
Charging station
Charging power
Serial number
Material number
System type
General:
Installation, electrical connection and initial operation of the charging station must be carried out by an electrician.
The charging station has not been installed in an explosion sensitive area (EX zone).
The charging station has been installed in a location where falling objects cannot damage the charging station.
The charging station has been installed in an area protected from direct sunlight.
Please underline the weather conditions on the installation date: sun, rain, overcast, snow or other
______________________________________________ .
The location of the charging station should be selected such that vehicles cannot inadvertently collide with it.
The legal requirements for electrical installations, fire protection, safety regulations and escape routes have been met.
The customer/user was informed how the Webasto Unite voltage is switched off with the installation-side protective
devices.
The cable bushing for the mains lead and signal cable has been installed during installation.
Tools and installation remnants have been removed from the charging station before closing the cover.
The prerequisite of a clockwise phase sequence is met during installation.
The locally applicable test logs should be drawn up during initial start-up and a copy should be given to the customer.
Electrician/contractor:
Place:
Date:
Place:
Date:
36 / 37
7,4 kW
TN/TT
Signature:
Signature:
7.1 kg
For three-phase models Ø 18 - 25 mm
For one-phase models Ø 13 - 18 mm
AC Mains / Ethernet / Modbus
IP54
IK10
-35 °C to 55 °C (without direct sunlight)
5% - 95% (relative humidity, non-condensing)
0 - 4,000 m
Webasto Unite
22 kW
IT
Split phase
Applic-
able/
com-
pleted
5111967A OI-II Webasto Unite

Advertisement

Table of Contents
loading

Table of Contents