Scope Of Delivery - Webasto Unite Operating And Installation Instructions

Table of Contents

Advertisement

4

Scope of delivery

Fig. 1
Pos. Item(s)
1
Dowels (M8 x 50, plastic)
2
Torx T25 security screw (M6
x 75)
3
Gasket for screw (6 x 75)
4
Torx T20 security L‑wrench
5
Wrench
6
RJ45 Male connector
7
Mounting template
8
O-ring
9
Screw (M6 x 20)
10
Screw (M6 x 30)
11
IP Rubber
12
User RFID Card
13
Master RFID Card
14
ISI Webasto Unite
5111967A OI-II Webasto Unite
1
5
2
6
3
7
4
Usage
To mount the charging station on the wall.
To mount the charging station on the wall.
To mount the charging station on the wall with the correct IP.
Wrench for screws to mount the charging station on the wall with the correct IP.
To fasten and unfastening the cable glands.
LAN cable connection (optional).
To mount the charging station to a wall.
To mount the charging station to a pole.
To mount the charging station to a pole.
To mount the charging station, and providing earth continuity for chargers
mounted on a metal surface. This screw must be inserted into the bottom hole of
charging station on the wall. Place a rubber ring (11) below this screw to fix the
ground cable.
To fix the ground cable with the M6 x 30 screw. This rubber ring must be placed
right-down the wall-mount hole of charging station, under the ground cable and
the M6 x 30 screw.
To start and stop charging.
To add and remove user RFID Cards to and from the local RFID list.
To install the charging station safely and adequately.
8
9
10
USE Spirit level for alignment
226,00
90º
11
65,50
Cable outlet
Print scale 1/1
Scope of delivery | 4
12
13
14
Quantity
4
4
4
1
1
1
1
3
3
1
1
2
1
1
7 / 37

Advertisement

Table of Contents
loading

Table of Contents