21 | Checklist for the installation of the Webasto charging station

21
Checklist for the installation of the Webasto charging station
Charging station
Charging power
Serial number
Material number
System type
DIP setting
With box for checking by the installer
General:
Installation, electrical connection and initial operation of the charging station must be carried out by an electrician.
Local conditions:
The charging station has not been installed in an explosion sensitive area (EX zone).
The charging station has been installed in a location where falling objects cannot damage the charging station.
The charging station has been installed in an area protected from direct sunlight.
Please underline the weather conditions on the installation date: sun, rain, overcast, snow or other
______________________________________________ .
The location of the charging station should be selected such that vehicles cannot inadvertently collide with it.
The legal requirements for electrical installations, fire protection, safety regulations and escape routes have been
met.
The charging cable and coupling has been protected against coming into contact with external heat sources, water,
dirt and chemicals.
The charging cable and coupling has been protected against being driven over, trapped, or any other mechanical
hazards.
The customer/user was informed how the Webasto Next voltage is switched off with the installation-side protective
devices.
Charging station requirements:
The cable bushing for the mains lead and signal cable has been installed during installation.
The kink protection for the charging cable has been screwed onto the charging station and the rubber seal has been
fitted correctly into the kink protection.
The appropriate charging cable (11 kW or 22 kW) has been connected to the charging station (as per type label)
during installation. The strain relief clamp that ensures the charging cable has strain relief has been fitted. The spe-
cified torques have been observed. The charging cable has been connected as per the instructions.
Tools and installation remnants have been removed from the charging station before closing the cover.
The CP line is installed correctly.
The prerequisite of a clockwise phase sequence is met during installation.
The locally applicable test logs should be drawn up during initial start-up and a copy should be given to the cus-
tomer.
Customer/client:
Place:
Date:
Electrician/contractor:
Place:
Date:
22 / 23
Webasto Next
11 kW
TN/TT
On
Off
D1
D4
Signature:
Signature:
22 kW
IT
Split phase
On
Off
D2
D5
5111232C OI-II Webasto Next_EN
On
Off
D3
D6
Applicable/
completed