Connection Of Operation Board I/O - Mitsubishi Electric MELDAS 600 Series Connection Manual

Hide thumbs Also See for MELDAS 600 Series:
Table of Contents

Advertisement

4.4.9 Connection of Operation Board I/O

The M6 Series operation board I/O is connected to RIO3 on the NC keyboard. Normally, connect the
remote I/O unit to RIO3, and configure the No. of I/O points according to the user specifications. (Fig. 1)
Refer to Chapter 6 Connection of remote I/O unit for details on the remote I/O unit.
When using the card-sized I/O for the operation board I/O, the user must manufacture a connector PCB
for the card-sized I/O. (Fig. 2)
Refer to section 5.3 Connection of card-sized I/O for details.
(When using remote I/O unit)
Operation board
(When using remote I/O unit)
Operation board
<Related items>
Cable manufacturing drawing: Appendix 2 (FCUA-R211 SH41 cable)
Connector pin assignment : 4.4.3 Operation board connector pin assignment
CHAPTER 4 SYSTEM CONNECTION
4.4 Connection of Operation Board
RIO3
FCUA- R211 cable
RIO3
FCUA- R211 cable
Remote I/O unit
Fig. 1
Connector PCB for car d size I/O
Operation board I/O
Card size I/O
Fig. 2
42
DI
DO

Advertisement

Table of Contents
loading

This manual is also suitable for:

Meldas m615Meldas m635Meldas m610Meldas m630

Table of Contents