Mitsubishi Electric MELDAS 600 Series Connection Manual page 134

Hide thumbs Also See for MELDAS 600 Series:
Table of Contents

Advertisement

(3) Remote I/O cable [FCUA-R211 cable]
Operation panel
Base I/O unit
• Use a shield clamp within 10cm from the panel's inlet/outlet.
• Install a ferrite core on both ends of the connected units.
CAUTION
• The shield clamp is not required if the control unit and base I/O unit are wired in the same
panel.
(4) Servo communication cable [SH21/FCUA-R000 cable]
Control panel
Base I/O unit
• Use a shield clamp within 10cm from the panel's inlet/outlet.
• Install a ferrite core on both ends of the connected units.
CAUTION
• The shield clamp is not required if the base I/O unit and drive section unit are wired in the
same panel.
APPENDIX 3 EMC INSTALLATION GUIDELINES
5. Measures for Wiring in Panel
Shield clamp
FCUA-R2 11 cable
Fer rite cor e
Shield clamp
SH21 cable
FCUA- R000 cable
Fer rite cor e
128
Control panel
Remote I/O unit
Control panel
Drive section unit
Drive section unit

Advertisement

Table of Contents
loading

This manual is also suitable for:

Meldas m615Meldas m635Meldas m610Meldas m630

Table of Contents