Download Print this page

Heartland VALUE Series Assembly Manual page 32

Classic 12' x 10' 365,8 x 304,8 cm
Hide thumbs Also See for VALUE Series:

Advertisement

PARTS REQUIRED:
x2
Pre - assembled
BEGIN
1
Measure 2-1/2" down from top plate doubler and mark at each side as shown.
Set gable unit on top plate. Fasten with (1) 2" nail on each side.
BE SURE GABLE IS CENTERED ON WALL BEFORE NAILING.
2
Continue nailing lower edge of panels to wall doubler with 2" nails spaced 6" apart.
3
Working inside, secure gable unit with (2) 3" screws angled into each AF at an angle (Fig. A).
NAIL FIRST
2-1/2"
2" (5,1 cm)
(6,3 cm)
Measure and
Mark
4
Continue securing panels to rafter with 2" nails spaced 6" apart.
Repeat steps to install the opposite side gable unit.
FINISH
Your gable units are now installed
GABLE INSTALLATION
DOUBLER
Fig. A
x8
x90
2" (5,1 cm)
6"
(15,2 cm)
3" (7,6 cm)
Screws
30
3" (7,6 cm)
AF
2-1/2"
(6,3 cm)
Measure and
Mark
NAIL FIRST
2" (5,1 cm)

Advertisement

loading

Related Products for Heartland VALUE Series

This manual is also suitable for:

16615-g