3.2.
Pedestal Anchor
The pedestal is designed to be mounted on a prefabricated anchor with free space in the center that has
conduit openings to allow for the passage of the power supply cables. The sections below show the
installation details. Certain types of installations may require a concrete base. Refer to the section below for
more information.
3.2.1.
Anchor Specifications
The installer can use a FLO prefabricated anchor (part number:
own using 12" long ½" threaded rods spaced according to the image below.
Prefabricated anchor
3.2.2.
Concrete Base Specifications
The concrete base can be prefabricated or made on site using a concrete formwork. The dimensions and
conduit positioning must be determined based on the environment and layout configuration.
3.2.2.1.
Dimensions
The base's height (H), depth in the ground (D), and surface area (A) must be determined according to the soil
type and the freeze/thaw specifications of the installation area. Use an appropriate electrical conduit with a
maximum diameter of 2'' (5.08 cm) to position the electrical cables in the center of the anchor. The pedestal
base opening has been sized to accept 2 PVC conduits up to 2'' (5.08 cm) in diameter each, whether in side-
by-side or back-to-back configuration.
3.2.2.2.
Conduit Positioning
The conduit positioning in the concrete base will vary according to the charging station configuration.
Side-by-Side Conduit Positioning
Single, Dual Side-by-Side, and Back-to-Back (Stations on Back and Front)
Use for
see section 3.3.1. to 3.3.3
(
The conduit positioning should follow the guidelines below:
.).
ACAN0001 or
C+V1-ANCHOR) or make their
Threaded rod spacing
charging station installation
9