CAUTION: This pedestal is certified as an electrical enclosure, and any alteration must comply
with local regulations.
6.3.
Dual Back-to-Back Charging Station Installation
The section below contains information and instructions on how to install the cable management system on a
back-to-back electric vehicle (EV) charging station installation.
6.3.1.
Required Material
The table below describes the material included with the EV charger. Use the number in the table to refer to
the material in the image.
Image Reference
Number
1
2
3
4
5
6
Included Material
Cable management system columns and cable clamp
Top mounting brackets
Round spacing shims
Rectangular spacing shims
Self-adhesive rubber band
¼-20 screws (1'') (max. torque: 90 LB-IN [10.0 N-M])
Quantity
2
2
2
2
2
6
31
Need help?
Do you have a question about the CoRe+ MAX and is the answer not in the manual?