WBM XPC500 Grapple Parts, Service And Installation page 22

Table of Contents

Advertisement

XPC500 / XPC600 GRAPPLE
PARTS, SERVICE AND INSTALLATION
INSTALLATION
JAW STOPS INSTALLATION
6. Open both jaws to gain access for welding of the stops.
7. Fully weld the stops with a 1/2" Fillet weld, all around. Locate welding ground
close to the stop to avoid current through the cylinder. Preheat the side plate/stop
location to 122° F before welding.
1/2
8. Slowly close the jaws to confirm the stops are connecting evenly with the stop
surface and that there is 3/8" stroke remaining in the cylinder. Adjust the stop
location, as required.
When performing installations with equipment in a fully operable condition ensure all personnel
and objects are at a safe working distance from the operating area of the machine. Failure to
comply may result in property damage, serious injury or death.
Weldco-Beales Manufacturing
!
WARNING
Attachment may not be exactly as illustrated
WELD IS 1/2" FILLET WELD,
ALL AROUND, REGARDLESS
OF STOP PROFILE.
WBM
Page 22

Hide quick links:

Advertisement

Table of Contents
loading

Related Products for WBM XPC500 Grapple

This manual is also suitable for:

Xpc600 grapple

Table of Contents