Husqvarna FE 250 2016 Repair Manual page 210

Table of Contents

Advertisement

18 ENGINE
Preparatory work
-
Check the transmission.
-
Carefully lubricate all parts before assembling.
Main work
-
Secure the countershaft in the bench vise with the toothed end facing downward.
Guideline
I
Use soft jaws.
-
Mount needle bearing
facing downward.
-
Mount stop disk@) and lock ring
-
Mount the sixth-gear sliding gear
-
Mount lock ring
-
Mount needle bearing
-
Mount needle bearing «i) and the third-gear idler gear
-
Mount stop disk
-
Mount the fifth-gear sliding gear
-
Mount needle bearing Ci), first-gear idler gear
-
Finally, check all the gear wheels for smooth operation.
208
(llill
p. 205)
O
and second-gear idler gear @ onto the countershaft with the protruding collar
C,.
0
with the shift groove facing up.
(D
and stop disk@.
(D
and the fourth-gear idler gear
48
and lock ring 41).
e
with the shift groove facing down and stop disk
@)
with the collar facing up.
48
with the collar facing down.
48
with the recess facing down, and stop disk
306577-11
48.
4D.
..

Advertisement

Table of Contents
loading

This manual is also suitable for:

F2103p4F2160p4F2175p4

Table of Contents