Terex ASV SR70 Service & Repair Manual page 94

Table of Contents

Advertisement

13-30
17. Apply red (high strength) thread locking compound
to the wheel retaining bolt as shown. (fig. 13-30)
13-31
18. Install the bolt and tighten it. (fig. 13-31)
19. If you haven't already, repeat steps 10-18 of this
procedure on the other side of the hub/wheel
assembly to secure the second wheel in place.
13-32
20. Once the hub/wheel assembly is together as
shown, torque the wheel retaining bolts to 180 ft.
lbs. to secure them in place. (fig. 13-32)
13-33
13-34
21. Remove the allen plug from the center of the hub
assembly and fill it with 2 ounces of ASV Posi
Lube
stall the plug. (fig. 13-33, 13-34)
22. Repeat this procedure on the other half of the
bogie assembly if necessary prior to installing the
two halves back onto the undercarriage.
13-35
23. Place the rubber rods back into position on the
square shaft, then tape them in place to keep
them secure while installing the bogie assemblies
around them. (fig. 13-35)
24. Reverse steps 1-3 of this procedure to reinstall the
bogie assembly back onto the undercarriage and
complete the procedure.
25. Repeat this procedure as necessary throughout
the SR-80 undercarriage to restore proper func-
tion.
13-7
https://tractormanualz.com/
TM
10W-30 Heavy Duty Engine Oil. Then rein-
Rubber Track Loader
13. Undercarriage

Advertisement

Table of Contents
loading

Table of Contents