Figure 45: Intact Vs Defected Power Pin Holders - Mellanox Technologies MSX6506-3R Hardware Installation Manual

108-port infiniband fdr switchx switch platform
Table of Contents

Advertisement

InfiniBand FDR Switch Platform Hardware User Manual
4. Check power connector's integrity. Look for any damage on the power connector
casing or blades damage, or any deviations from the pass criterion shown in
Figure 45.
5. Start with the ejector handles fully open; that is, at 45 degrees to the front panel of the
management.
6. Holding the management by its sides, carefully set the management board into the
chassis.
7. Using only the management ejector handles, slowly slide the board into the chassis
until the hooks reach the vertical bar.
8. Catch the hooks onto the vertical bar of the chassis and push the ejector handle shut.
9. Lock the ejector handles onto the board.
Mellanox Technologies

Figure 45: Intact vs Defected Power Pin Holders

Pass
Do not apply excessive force to slide in the management board. If you feel resistance,
remove the management and double check both the chassis and management for any
damage.
On switch systems with dual management systems, first connect the cable and configure
the master management module CPU and only then configure the slave. By default the
master CPU is the top management module. For further information on the master and
MLNX-OS®
slave roles, see the
All management modules in the chassis must go through an initial configuration proce-
dure. See the Installation Guide for the initial configuration procedure.
Fail
Software UM section "High Availability".
52

Advertisement

Table of Contents
loading

This manual is also suitable for:

Msx6506-nr

Table of Contents