Stone Formations - probst HVZ-UNI-II Operating Instructions Manual

Table of Contents

Advertisement

Available languages

Available languages

General
3.2

Stone formations

1.) The stone formations 1 – 20 shown
below are suitable among others for
mechanical installation. Other stone
formations can also be laid by machines
as long as the stones are packed in the
correct formation ready for the
machine to lay them.
2.) The stone formations 16 – 20 are
suitable for mechanical installation by
the shifting adapter PA (4140.0003).
3.) The stone formations 21 – 25 are
suitable for mechanical installation by
special adapter.
Special adapters SA for installation units 21–24 or similar are available on request (indicate stone formation).
Accessoires set:
A
Tubular box spanner for adjusting the side clamping
(7063.0001)
B
Allen key No. 08 to shift the position adapter rail (7063.0001)
C
Feather steel lamellas to extend the gripper length at the
main clamping (34010100)
D
Feather steel lamellas to reduce the gripper length at the
main clamping (34010016)
11 / 41

Advertisement

Table of Contents
loading

This manual is also suitable for:

5140003651400037

Table of Contents