Filling The Tanks - Kodak X-Omat 460 RA Operator's Manual

Hide thumbs Also See for X-Omat 460 RA:
Table of Contents

Advertisement

Filling the Tanks

DEVELOPER
RACK
ASSEMBLY
636736
[1]
Check that the developer heat exchanger cover is correctly positioned in the
bottom of the developer tank.
[2]
Check that the Developer, Fixer, and Wash Racks are in their correct positions.
FIXER RACK
ASSEMBLY
Figure 5 Installing the Racks
If the top cover is on the processor when the processor is turned on, the
replenisher pumps and drive motor will turn on for a short period and
circulation of the wash water begins automatically.
[3]
Check that CB2, CB3, and CB4 are in the ''I'' position.
[4]
Move the main circuit breaker, CB1, to the ''I'' position.
[5]
Wait for the main menu to appear on the display panel.
• Be sure that within 20 seconds after you complete your first entry, you
press the soft key for your next desired selection . If you do not press
a key within 20 seconds of your previous entry, the LCD will again
display the main menu.
• An alarm ''beep'' will occur twice whenever there is an error condition with the
processor and a sheet of film is fed into the processor.
• See to page 45 or 46 to see the ''Menu Flowchart for the RA Processor.''
[6]
Press the ''GO TO SETUP'' key.
READY
135 F = DRYER SETPOINT
_______________________________________
|
/\
|
DRYER
DRYER
|
IMPORTANT
IMPORTANT
STD
|
|
|
\/
SELECT
DISPLAY
GO TO
|
|
|
CYCLE
FIX
SETUP
|
|
|
TEMP
SQUEEGEE
ASSEMBLY
WASH
RACK
ASSEMBLY
H108_0055BCB
H108_0051BA
11

Advertisement

Table of Contents
loading

Table of Contents