Acceptance Check - EBARA EV-PA 250 Instruction Manual

Dry vacuum pump
Table of Contents

Advertisement

16
P.

1. Acceptance Check

Check the following items on receipt of the pump package.
(1) Check that the nameplate affixed to the outer cover of the pump to confirm that the pump supplied
agrees with your order.
submitted drawings and documents to confirm that the all ordered accessories have been supplied.
(2) Check that no damage for the pump has occurred in transit.
(3) Store the pump in a dry and clean place if it is not installed at once after delivery.
Note
Notify EBARA without delay when damage is discovered or when components are missing.
Do not use when a leak is present as this will result in accident.
Note
Placed the pump in an upright position. Do not stack as packing. When the pump is
overturned, this will result in accident.
PM10U
Check the accessories against the packing list and the previously
Temperature :
5℃ to 40°C
Humidity
:
80% or less
EBARA
CORPORATION

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ev-pa 500

Table of Contents