Annex 3; Weekly Maintenance Schedule - Cafection Encore GROUND Service & Installation Manual

Hide thumbs Also See for Encore GROUND:
Table of Contents

Advertisement

SERVICE & INSTALLATION MANUAL for Cafection's Encore Ground
www.cafection.com

ANNEX 3

WEEKLY MAINTENANCE SCHEDULE

All important parts of the unit must be maintained as per the Maintenance Schedule to honor the warranty and to
avoid possible defects. Adequate maintenance will extend the life of the coffee machine and deliver a consistent
high quality beverage.
WEEKLY MAINTENANCE
Verify the filter paper level.
Sanitize the brew chamber with a hot water cycle.
Sanitize the solubles mixing bowl with a hot water cycle.
Capture data from the software.
Verify the overflow cup.
Verify the overflow tray.
PREVENTIVE MAINTENANCE SCHEDULE AT DIFFERENT CYCLES
5,000 cycles
10,000 cycles
25,000 cycles
50,000 cycles
100,000 cycles
ENCORE GROUND Rev. 1 2021-10
800-561-6162
Clean the brew group with a commercial urn cleaner.
Check & replace the outlet valves.
Check & replace the water filter.
Replace the brew group via Cafection's Brew Group Exchange Program.
Replace the whipping motor(s).
Delime the water tank & outlet valves.
Replace the water tank float, the heater switch & the water level switch.
79

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Encore GROUND and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Table of Contents