8
PREVENTIVE MAINTENANCE
All important parts of the unit must be maintained as per the preventive maintenance schedule to honor
the warranty and to avoid possible defects. Adequate maintenance will extend the life of the coffee
machine and deliver a consistent high quality beverage.
The preventive maintenance schedule and instructions below must be followed to
honor the warranty.
8.1
Preventive Maintenance (PM) Schedule
All parts must be visually inspected upon each visit and cleaned as needed.
Brew Group
Assembly
Outlet Valves
Hot Water Tank
66
SERVICE & INSTALLATION MANUAL for Cafection's Encore Ground
Inspection
Monthly
Quarterly
Quarterly
www.cafection.com
Preventive Maintenance
25,000 cycles
or annually
10,000 cycles
60,000 cycles
ENCORE GROUND Rev. 1 2021-10
800-561-6162
See Section
8.2
8.3
8.4
Need help?
Do you have a question about the Encore GROUND and is the answer not in the manual?
Questions and answers