Junction Box - Furuno FSV-25 MARK-2 Installation Manual

Color scanning solar
Table of Contents

Advertisement

Suspending the FSV-252 (when using a crane, etc.)
The FSV-252 weighs approximately 37.5 kg. The attached eye-bolts are used when
hanging the FSV-252. Only suspend the FSV-252 upside down when moving it, do not
install the FSV-252 upside down. Use the figure below for reference.
Rope
Default placement of eyebolts
1.6

Junction Box

A junction box must be in-
stalled between the transceiv-
er and the hull unit. Referring
to the outline drawings at the
back of this manual for dimen-
sions, install the junction box
on a wall or bulkhead where
possible. Where installation
on a wall or bulkhead is not
possible, install the junction
box securely on the hull unit
stand. When installing the
junction box to the hull unit,
secure the supplied fixing
plate to the hull unit, using
hex. washer head bolts
(M1235, 6 pcs., supplied).
Secondary secure the junction
box to the fixing plate, using
hex. washer head bolts
(M1025, 6 pcs., supplied).
Note: The fixing plate must be
oriented in the direction as
shown in the figure to the right.
Eyebolts
When suspending the
unit upside down, place
the eyebolts at the
opposite side of the unit
Fixing plate
Hex. washer head bolt
(M12×35, 6 pcs)
Junction box
Hex. washer head bolt
(M10×25, 6 pcs)
1. HOW TO INSTALL THE SYSTEM
Rope
Suspended upside down
1-15

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fsv-25s mark-2

Table of Contents