Control Box Extension Box - Furuno FSV-25 MARK-2 Installation Manual

Color scanning solar
Table of Contents

Advertisement

1.8

Control Box Extension Box

To install the optional control box extension box, do the following.
1. Unfasten the M10 bolts (4 pcs.) connecting the raise/lower control box to the hull
unit.
2. Disconnect the raise/lower control box cabling, then connect the cables to the
control box extension box.
3. Install the extension box in the location the raise/lower control box originally was
installed, using the M10 bolts (4 pcs.) unfastened in step 1.
Hex washer head bolt
2 × M10×20 SUS
Control box
extension box
FSV-2560
Flat washer
×
2
Spring washer
×
2
Nut
×
2
M10 SUS
M10 SUS
M10 SUS
1. HOW TO INSTALL THE SYSTEM
M10 bolt
mounting holes
Raise/lower control
box fixing bolts
1-17

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fsv-25s mark-2

Table of Contents