Furuno FSV-25 MARK-2 Installation Manual page 53

Color scanning solar
Table of Contents

Advertisement

5. Unfasten four screws and set the inertial measurement unit, then fasten the
screws to secure it.
6. Connect the D-SUB connector inside the control box extension box to the inertial
measurement unit.
7. Fasten the ground wire (crimp-on lug) of the D-SUB cable to the ground terminal.
8. Reattach the top cover and front cover.
Inertial measurement unit
Connect the D-SUB
cable to the inertial
measurement unit.
Fasten the ground wire
of the D-SUB cable to
this location.
Rear side: Inertial measurement unit
Set the unit to the mounting screws,
then fasten the screws.
2. WIRING
2-21

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fsv-25s mark-2

Table of Contents