Furuno FSV-25 MARK-2 Installation Manual page 12

Color scanning solar
Table of Contents

Advertisement

1. HOW TO INSTALL THE SYSTEM
2. Apply lithium grease to the O-ring and O-ring groove. Place the O-ring in its
groove on the tank flange.
3. Orient the hull unit so that the bow mark (inscribed) on its flange points toward the
ship's bow. Note that heading adjustment is required if the bow mark is not facing
the ship's bow. (See section 3.4.)
4. Confirm the points as listed below, then place the hull unit on the tank.
• Clean the flange platform.
• Wipe the under-face of the hull unit with clean waste cloths.
• Keep the O-ring in its groove.
5. Apply a slight amount of lithium grease to the threads of the hex bolts and stud
bolts to prevent scorching, then secure the hull unit to the retraction tank, referring
to the following figure.
Spring washer
Flat washer
Bow mark
Hull unit flange
Flat washer
Spring
washer
Flat
washer
Hex bolt
(17 places)
Fastening torque: 230 N•m
EMERGENCY STOP button
The EMERGENCY STOP button is
attached to the starboard side of the
hull unit. If the starboard side clear-
ance is not sufficient for switch oper-
ation, the switch may be remounted
on the port side.
Note: The junction box (FSV-2550-
MK2) cannot be mounted to the hull
unit when the EMERGENCY STOP
button is remounted on the port side.
Mount the junction box to a bulkhead near the hull unit.
1-4
Hex nut
O-ring
Tank flange
Hex bolt
Bow side
Hex nut
O-ring
Retraction tank
EMERGENCY STOP button
This button may be remounted
on the port side if the starboard
side clearance is not sufficient
for operation.
Stern side
O-ring
washer
Spring
washer
Hex nut
Fastening torque: 230 N•m
EMERGENCY STOP button
Flat

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fsv-25s mark-2

Table of Contents