Furuno FSV-25 MARK-2 Installation Manual page 36

Color scanning solar
Table of Contents

Advertisement

2. WIRING
2.2
Processor Unit
2.2.1
Connectors
Cable entrance
IV-8sq.
MJ-A3SPF0018-050ZC,
5 m
POWER
12/24 VDC
Ground Terminal
To ship's ground
*1
: Fabricate the cable referring to section 2.2.3.
*2
: To connect a USB device, use the lower USB port first.
*3
: Requires HUB-100.
Secure the USB, HDMI and LAN cables to the cable clamp with a cable tie (supplied
locally). For the USB cables, use two cable ties to secure the cable.
Note: The cable clamp can be adjusted to allow larger connectors, such as USB or
HDMI, to be connected.
Secure each cable
using a cable tie.
2-4
USB1
*2
USB3.0
USB3
USB cable
SPEAKER
To Speaker
USB4
(SEM-21Q)
*2
USB2
USB3.0
*2
USB2.0
HDMI1 To Monitor Unit (Main)
HDMI2 To Monitor Unit (Sub)
HDMI-TO-DVI-L,
5.3/10.3 m
USB cable
*2
USB2.0
LAN1
To Transceiver Unit, F3D-S
TZ Professional
Note: Use LAN1 port for
connection with the Trans-
ceiver Unit.
Unfasten the indicated screws to
adjust the cable clamp. Refasten the
screws to secure the cable clamp after
adjustment.
LAN2
Not used.
*1
DTIC5E350SLABVCVxxT
Max 100 m
*3
,
*3
,

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fsv-25s mark-2

Table of Contents