1. HOW TO INSTALL THE SYSTEM
1.7

Raise/Lower Control Box

The inertial measurement unit is installed in the raise/lower control box. When using
the control box extension box (FSV-2560), remove the inertial measurement unit and
two fans from the raise/lower control box and install them in the control box extension
box, then secure the control box extension box to the hull unit.
How to attach the raise/lower control box to a bulkhead
When using the control box extension box,
the raise/lower control box can only be in-
stalled on a bulkhead. Use four M10 bolts
to fasten the raise/lower control box in po-
sition.
The internal electromagnetic switches only
function correctly if the raise/lower control
box is installed in the correct orientation,
as shown in the figure to the right.
Note 1: When installing the inertial mea-
surement unit inside the raise/lower con-
trol box, you must enter the location and angle of the raise/lower control box for
heading correction. (See section 3.4 for how to adjust the heading.)
Note 2: When the raise/lower control box is mounted separately from the hull unit, re-
move the inertial measurement unit and two fans from the raise/lower control box and
install them in the control box extension box, then secure the control box extension
box to the hull unit. The reference position for the inertial measurement unit is based
on the state where it is attached to the hull unit. Therefore, if the inertial measurement
unit is separated from the hull unit, stabilizer function does not work properly.
1-16