SP-2000/X-Y
Introduction
This chapter covers uncrating the pedestal, driving it off the skid and installing it
into your system. These instructions will also be useful if the pedestal needs to
be relocated to a different studio or a new facility. Refer to the User Manuals for
your pan/tilt heads and controller for additional information.
Tools You Will Need
You will need the following tools during the unpacking and installation:
3-2
For proper performance of the equipment and to prevent per-
sonal injury it is critical that the procedures in this manual
are followed exactly.
•
2 medium size crescent wrenches
•
3/16" hex key
•
1/4", 5/16" hex keys (if covers need to be removed)
Installation
User Manual