Visual & Daily Maintenance Inspections
1
2

4.2-9 Boom assembly

Load cell
1
Ensure there are no loose or missing parts and
there is no visible damage.
Ensure all bolts are properly tightened.
Ensure all cables are secure and are in proper
working condition.
Ensure debris is not lodged between the
platform and boom adaptor.
Rotary actuator
2
Ensure there are no loose or missing parts and
there is no visible damage.
Ensure all bolts and pins are properly
tightened.
Ensure all hoses are properly tightened and
there is no evidence of hydraulic leakage.
Jib
3
Ensure there are no loose or missing parts and
there is no visible damage.
Ensure all bolts and pins are properly
tightened.
Ensure all hoses are properly tightened and
there is no evidence of hydraulic leakage.
E-chain
4
Ensure there are no loose or missing parts and
there is no visible damage.
Cylinders
5
Ensure all cylinders are properly secured and
there is no evidence of leakage.
SJ85 AJ
6
3
4
5
7
Wear pads
6
Ensure all bolts are tight, there is no visible
damage to the wear pads and that no parts
are missing.
Boom
7
Ensure there are no loose or missing parts and
there is no visible damage.
Ensure all bolts and pins are properly
tightened.
Ensure all hoses are properly tightened and
there is no evidence of hydraulic leakage.
Hoses
Ensure all hoses are properly tightened and
there is no evidence of hydraulic leakage.