Section 4 - Pre-Operation; Operator's Responsibility - Skyjack SJ85 AJ Operating Manual

Hide thumbs Also See for SJ85 AJ:
Table of Contents

Advertisement

Section 4 – Pre-operation

4.1 Operator's Responsibility

It is the responsibility of the operator, prior to each
work shift, to perform the following:
1. Visual and daily maintenance inspections
designed to discover any damage of
components before the MEWP is put into
service.
done before the operator performs the function
tests.
WARNING
Failure to locate and repair damage, and discover
loose or missing parts may result in an unsafe
operating condition.
2. Function tests
designed to discover any malfunctions before
the MEWP is put into service.
IMPORTANT
The operator must understand and follow the step-
by-step instructions to test all MEWP functions.
The operator should make a copy of the Operator's
Checklist (see
Section
4.4) and fill out the visual
and daily maintenance inspections and the function
tests sections while performing the items outlined in
Section 4.2
and
Section 4.3
IMPORTANT
If MEWP is damaged or any unauthorized variation
from factory-delivered condition is discovered,
MEWP must be tagged and removed from service.
Repairs to the MEWP may only be made by qualified/
competent repair personnel. After repairs are
completed, the operator must perform visual and daily
maintenance inspections, and function tests again.
Scheduled maintenance inspections shall only be
performed by a qualified/competent person.
SJ85 AJ
respectively.
213217AAA
39

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

213217aaa

Table of Contents