Overcurrent
H
As a general rule, load monitoring does not yet take place during the soft start
phase (which can last for an extended period due to active current limiting) as
the standard working range of the load has not yet been reached. Teach-In
cannot yet be performed in this phase either.
V1.00/EN/00741192/2021-03-30 [IPC 300]
Number of
Single-phase op-
heating ele-
eration
ments
6
5
4
3
2
Example for 2
heating
ele-
ments
The specifications in % refer to load current changes
6 Special device functions
10 %
13 %
17 %
25 %
50 %
L1
N
IPC 300
D
1D
65