2.3 Installing equipment on cart (optional)
There is a 4-wheel transport unit available for use with the MasterTig welding equipment.
Tools needed:
1.
Install the cooling unit on the cart.
2.
Fix the cooling unit to the cart with two screws (M5x12) in the front and two screws (M5x12) in the rear.
© Kemppi
12
MasterTig 535ACDC
Operating manual - EN
1921940 / 2140