Miller Condor Series (CAN Product Control) AccuBoom Installation Manual
Installing the
Cable
4
1. Attach the AccuBoom harness to the CAN node.
2. Locate the existing bulkhead connector on the right rear corner of
chassis and disconnect. (See Figure 2)
Figure 2: Bulkhead Connector
3. Tee in AccuBoom harness between the bulkhead and the previously
disconnected harness. (See Figure 3)
Figure 3: Tee in AccuBoom Harness
4. Connect the CAN Tee cable to the AccuBoom harness and connect to
the Raven CAN Bus. Attach the terminator to the CAN tee Cable.