Download Print this page

Flowserve FlowTop V726 Disassembly/Reassembly Instructions page 41

Hide thumbs Also See for FlowTop V726:

Advertisement

D is asse m ly
S t ep 07
Remove packing (3.3) and bottom ring (3.2)
with Special Tool
(Packing driver tool)
CAUT ION !
Do not damage packing area and guide !
R e asse m bly
S tep 07
Reassembly takes place in reverse order.
CAUT ION !
Clean parts, check packing area and guide for
damage, grease stud screws!
( Damage to the packing packing area will lead to early
leaks in the packing unit )
Lubrication as per Table 06 (Page 65)
The packing unit is confi gurated as per the
variant drawing (Page 61 - 63)
Use new packing (3.3) !
Tighten hexagon nuts (3.6 / 3.9) by hand fi rst
CAUT ION !
The hexagon nuts (3.6 / 3.9) are tightened
at the "Reassembly" step
D is asse m bly
S t ep 08
Remove driving band (2.21)
Remove circlip for shafts (2.23)
Remove ring (2.22) and balancing seal ring (2.12)
CAUT ION !
Do not damage stem and plug !
R e asse m bly
S tep 08
Reassembly takes place in reverse order.
CAUT ION !
Clean parts, check sealing surfaces for damage
and renew if necessary.
Push balancing seal ring (2.12) on the plug
Lay ring (2.22) in place
Secure using circlip for shafts (2.23)
Only insert guide band at "Reassembly" Step 06
Schmidt Armaturen
AI - FlowTop
S tep 01
41

Hide quick links:

Advertisement

loading
Need help?

Need help?

Do you have a question about the FlowTop V726 and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Flowtop v738Flowtop v740