GAA610-M ADVANCED EMISSION GAS MONITORING SYSTEM | OI/GAA610-M-EN REV. B
Mounting brackets
Incorrect
Figure 20: Mounting brackets
A
Do not squeeze the heat insulation in mounting brackets
tightly together, so that the outer braiding is pressed on to
the heat conductor. If you disregard this, damage to the
protective braiding and the heated sample gas line may
occur.
B
Tighten the BBS cable clips sufficiently but not excessively, in
order to prevent damage to the protective braiding and the
heated sample gas line.
Permissible values for laying the sample gas line
Characteristic
Permissible value
Type
Heated, Type TBL01-S, regulated heating, 180 °C,
heating power 90 W/m (TBL01-S); approx. 100
W/m if other is used
Maximum line length
230 V AC: max. 30 m
Minimum bending radius
300 mm
Maximum clip distance
1.2 m with horizontal laying
3.5 m with vertical laying
Lowest laying temperature −10 °C
Temperature of the
max. 60 °C
sheathing
Back-purging unit installation
Before the installation
Observe the 'Piping plan' in the drawings set.
Correct
Installation site
The distance between the back-purging unit and the sampling
probe should be as short as possible and must not exceed 2 m
(6.6 ft).
Connecting the compressed-air tubes
1 Back-purging panel
2 Filter unit
3 Instrument air inlet
Figure 21: Connecting the back purging unit
1. Mount the solenoid valves on the filter unit as illustrated.
2. Connect the compressed-air pipes for purge air and control
air to the respective ports at the filter unit.
3. Connect the electrical cables of the solenoid valves to the
corresponding terminal strip in the analyzer cabinet. For
details see the wiring diagram or Terminal assignment –
Analyzer cabinet on page 35.
4 Solenoid valve SOV2
5 Solenoid valve SOV2
29