SmartPrep
Monitoring a Degas Operation
The SmartPrep Status dialog box, shown below, enables you to monitor degas op-
erations and stop gas flow after samples are degassed. (Refer to Show Status in
Chapter 3 for a detailed description of this dialog box.) When the degas opera-
tion is complete, refer to Completing a Degas Operation in this chapter.
For each sample station, the following information is displayed:
Sample
Status
Temp
Gas Valve
Sep 98
The name and path of the sample information file
being used.
The current degas status as described below.
1. Idle
2. Stage n of n: Ramping to nnn
o
nn
C/min
3. Stage n of n: Soaking (number of
minutes remaining)
4. Cooldown
Displays the current temperature (+10
sample being degassed.
Informs you whether the heating station's gas
valve is opened or closed.
Degassing Samples
o
C at
o
C) of the
2-29
Need help?
Do you have a question about the SmartPrep 065 and is the answer not in the manual?