Control Interlock Removal (continued)
Control Interlock Installation
Control Replacement and Adjustment
Deflector Cable Removal
Controls: Service and Repairs
g263049
Note: Notice the spring on the lockout latch. The end with the slight bend goes
behind the lockout latch and the hooked end goes over the small tab. It is easier
to install the latch mechanism first, then hook the end of the spring with a wire
to pull into place.
1. Install the traction lever and torsion spring.
2. Install the lockout link onto the lockout rod.
3. Install the lockout cam and auger lever.
4. Install the 2 roll pins on the LH side and the pin in the lockout cam on the
RH side.
5. Install the lockout latch, extension spring, flat washer, and locknut. Install the
shoulder screw under the RH handgrip
6. If this is a wheel clutch model, connect the wheel clutch cables. Connect the
auger and traction cables to the levers.
1. Park the machine on a level surface. Stop the engine, wait for all moving
parts to stop and remove the key.
2. Depress the tabs that retain the cable in the bracket under the control panel.
Disconnect the Z-bend on the end.
Figure 48
Page 6–12
POWER TRX™ HD Service Manual
3440-740 Rev A