Running the Test
Once the Sequence is complete, you are ready to run the test.
Device Tests can be started and stopped from the user interface. They can
also be started and stopped by an external signal applied to the
EXT INPUT connector of the master clock module.
N O T E
Before starting a test, it is recommended to check the parameter settings
of the ports and channels. To be successful, delays must fit to the chosen
data formats, voltages and impedances to the DUT.
This chapter informs you about
"How to Download the Test Sequence" on page 183
"How to View BER Test Results" on page 184
"How to Start/Stop the Test" on page 185
182
HP 81200 Data Generator/Analyzer Platform User Guide, Revision 2.1