Initial Commissioning - Xylem WTW Turb 430 IR/T Operating Manual

Handheld turbidimeter
Hide thumbs Also See for WTW Turb 430 IR/T:
Table of Contents

Advertisement

Turb 430 IR/T
ba75507d09
08/2021
3.4

Initial commissioning

Perform the following activities:
 For
– Battery pack operation: Insert the battery pack (see section 5.1.2)
– Line power operation and charging the battery pack: Connect the
power pack (see section 3.2)
– operation with LabStation: connect the LabStation and place the
Turb 430 IR/T in the LabStation (see section 3.3)
 Switch on the meter (see section 4.1)
 Set the language as necessary (see section 4.4.3)
 Set the date and time as necessary (see section 4.4.4)
When you set the language, date and time according to the men-
tioned sections of this operating manual you will quickly become
familiar with the simple operation of the Turb 430 IR/T.
Commissioning
LabStation
15

Advertisement

Table of Contents
loading

This manual is also suitable for:

600325

Table of Contents