7. OPERATION AND MAINTENANCE

7.1 Operation
7.1.1 For three-phase mains input, make sure the phase sequence is correct; For single
phase mains input, please confirm "L" is connected to R-phase(A-phase) on the
terminal block of the input before supplying mains power to the UPS.
Note
7.1.2 Switch ON the breaker on the rear panel of the Battery Pack(s).
Note
connections between the UPS system frame and the Battery Pack are correct.
7.1.3 Switch ON the input breaker on the rear panel of the UPS frame. The cooling fans start
to rotate.
7.1.4 Switch the "System Startup Switch" on the back of the LCD panel to the ON position,
and refer to the LCD display in the following to operate.
Note : The parameters below are for quick reference only and may vary from actually
1) Power On
UPS SELF TESTING
PLEASE WAIT A MOMENT
4) Press ESC, or in 12 mins without
pressing any key
LOAD: 0% BATT: 137
I/P VOLT: 220 220 221
O/P VOLT: 220
O/P FREQ: 50.0Hz
STATUS: BYPASS MODE
*UPS STATUS: BYPASS MODE, 3PHASE I/P(R PHASE I/P),
BATTERY MODE, UPS SELFTEST, REMOTE SHUTD.
"BATT OPEN"=" BATT DISCONNECT"
N wire must be connected correctly
Before turning on the breaker please ensure that the polarities of +, - of the
application. The example here is with three-phase mains input.
A UPS
.
2) In about 18 seconds
UPS ON
4) Press ▼
OUTPUT PARAMETER
VOLT: 220V
CURR: 10A
FREQ: 50.0Hz
18
SETUP
INQUIRE