Installation and connection

5.3.1 Placing the pump unit on the foundation

5.3.2 Aligning the base plate

30
Special tool:
Materials:
Fig. 7: Installation on a foundation (schematic diagram)
1.
Lift pump assembly (
Ä Chapter 4.1 'Transportation' on page 21).
2.
Hook in the foundation bolts (1) into the base plate fastening holes from
below.
3.
Place the pump unit on the foundation. When doing so, sink the foundation
bolts (1) into the prepared anchor holes.
4.
Using steel fixtures, align the pump unit in accordance with the height and
system dimensions as follows:
n
n
5.
Ensure that the base plate and steel fixtures lie flush.
6.
Using a digital spirit level (laser alignment device), check in longitudinal
and transverse directions:
n
7.
Repeat the process until the base plate is correctly aligned.
Type SLH-4U
n
Spirit level
n
Foundation bolts
Steel fixtures
n
n
Casting mortar, non-shrinking
pump system operating instructions and
When using adhesive anchors: Observe the manufacturer's
instructions.
Place a steel fixture (2) to the left and right of each foundation bolt (1)
respectively.
If the distance from the anchor holes is greater than 750 mm, locate
additional steel fixtures (3) centrally on either side of the base plate.
Permissible height deviation (
on page 30, dimensional drawings, pump system operating instruc-
tions).
NOTICE!
Property damage due to base plate tension!
A tensioned base plate may prevent coupling alignment and
result in pump damage.
Base plate on level foundation only and fasten as follows.
It is essential to observe the alignment tolerances.
03/2020 JP Rev. 1
Ä Chapter 5.3.2 'Aligning the base plate'

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Bornemann SLH-4U and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents